Year 2008East Quarry Landfill Gas Collection Expansion

Clients: Walker Brothers
Location: Thorold, Ontario
Scope of Work: Architectural, Structural Engineering, Electrical Engineering, Mechanical Engineering, Civil Engineering
Area: 2,970 sq.ft. (276 sq.metres)
Budget: $700,000
Completion: 2008

IGRS, a division of Walker Industries, retained Quartek Group Inc. for the expansion of its existing Landfill Gas Collection System.  The expansion consisted of doubling the size of the existing facility plus the addition of a new flare. Renovations were also required to bring the existing building to present standards. The building involved gas detection systems, a fire detection/suppression system, security systems, HVAC systems, as well as, explosion panels.

The project was completed on schedule and within budget.

Quartek provided architectural, structural, mechanical, electrical, and civil engineering services throughout design, tender and construction phases.